Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Set PM utility is a handy tool in RTA for making mass edits to PM schedules across multiple asset classes, departments, models, etc.

...

  • Update/Create PMs - Change existing PMs or Create new schedules

  • Disable PMs - Turn existing PM schedules off for a time

  • Delete PMs - Remove existing PMsCopy PMs - Copy PMs from one vehicle to others

To access the utility, navigate to the asset master list and click the Set PM button in the upper right corner.

...

Note

There is no UNDO for these edits so be sure to check your work carefully as you go.

Select from the edit type in the table of contents below to be taken to the appropriate section.

Table of Contents
maxLevel6
minLevel1
include
outlinefalse
indent
exclude
typelist
printablefalse
class

Update/Create PMs

This option will allow a user to update existing PM schedules or create PM schedules for one or more assets selected.

...

Note

The Skip Blank Fields option should be checked if the user wants to ensure that any fields left blank in the Update PM Info Panel are not overwritten to be blank in existing PM schedules already set for the selected list of assetscheckbox essentially says that if a field is blank RTA will skip it during the edit rather than set it to blank. This allows users to do something like update the description by itself without affecting the rest of the items.

...

Update PM Info Panel Fields

...

Field Title

Description/Use

PM Code

Prefilled with the PM Code entered during step 2c above or blank if left blank and user can add the PM code to be added/updated to the asset list here

VMRS

Add the corresponding VMRS code associated with the selected PM code in the RTA system. PM Schedules should be and are generally listed with the 066 Major VMRS Code

PM Description

Prefilled to match the VMRS Code added

Interval

Select the intervals to be used for measuring and determining when the PM should be completed. Options include days, units (meter), gallons, etc.

Include PM

If this PM should be nested with another schedule, be sure to include that PM code here. For example, a PM A Safety Inspection performed monthly might be nested to be included with a PM B Oil Service which happens every three months. This ensures that when the asset is brought in for the oil service, the inspection is completed at the same time eliminating the need to pull the asset in again separately.

One Time PM Selector

Select this option if this PM will only occur once. Typically this is left off but would apply to something like a warranty expiration PM.

Work Order Template

Link a created work order template to this schedule

PM Part Kit

Link a created PM Part Kit to this schedule

Inspection

Link a created paperless inspection to this schedule

Override Sleep PM Selector

Select if wanting to update the schedule sleep mode (make inactive for a time)

Sleep PM Selector

Turn on to put to sleep and select a date range for the schedule to snooze

Disable PMs

Use this option to disable PM for the asset range selected. This means that PMs due will not trigger.

  1. Click the Set PM button from the asset master list

  2. The user will be directed to the Set PM screen where there will be three imperative steps

    1. Select the assets to be included in the disable function Select Assets from the list for which the edits will be applicable

      1. Use the filter, sort, and search options in the list to narrow down/refine the list to get to the necessary assets

        Image Added
      2. Use the selection boxes to the left of the line items to “select” the assets to be included or use the “select all” option to include all assets in the initial or refined list

        Image Added
    2. Once the preferred assets have been selected, click Next

    3. Enter the PM Code to be disabled across the list of assets chosen

    4. Ensure the radial to Disable PMs is selected

    5. Click Set

    6. A confirmation box will appear confirming the PM and number of assets to be affected by the change

      1. If correct, click Disable

        Image Added

Delete PMs

...

Use this option to delete PMs for the asset range selected. If the PM does not exist it will be skipped during the process in particular asset files.

  1. Click the Set PM button from the asset master list

  2. The user will be directed to the Set PM screen where there will be three imperative steps

    1. Select the assets to be included in the disable function Select Assets from the list for which the edits will be applicable

      1. Use the filter, sort, and search options in the list to narrow down/refine the list to get to the necessary assets

        Image Added
      2. Use the selection boxes to the left of the line items to “select” the assets to be included or use the “select all” option to include all assets in the initial or refined list

        Image Added
    2. Once the preferred assets have been selected, click Next

    3. Enter the PM Code to be deleted across the list of assets chosen

    4. Ensure the radial to Delete PMs is selected

      Image Added
    5. Click Set

    6. A confirmation box will appear confirming the PM and number of assets to be affected by the change

      1. If correct, click Delete

        Image Added