Adding a Tire Inspection

STOPPED HERE!!!!

Once the inspection is added to the work order the technician must complete it before the the line can be closed. To access the inspection, click on the job line that contains the inspection, and click on the inspection button with the red !.

...

New-Inspection.pngImage Added

When you start the inspection you will see all of the sections with their respective steps below. Click on the down arrow next to “incomplete” on the right side of the step to expand the section.

Once the section is expanded the technician will have the ability to enter notes, then click on pass or fail to complete this step.

If the inspection step was created with more than one location and prompts were used, the above screen is what it would look like. In this case the prompts are a required field and the prompt is “Brake Measurements in 32nd’s”. The brake measurement section was also set up with “4” as a max locations number signifying the four brake measurements this inspection requires be completed. The technician would click “add location” as needed to enter each locations measurements.

If any section fails that have defects set up, those defects will be added to the work order so the technician can clock in and repair the defect when they are done with the inspection. Click the pass or fail button for each step in the inspection, and hit submit when done to complete the inspection.

You will see a green checkmark next to the inspection when it has been completed. You can click the inspection button at any time to review any notes or items which passed or failed.

Tire-Inspection List With Inspections.pngImage Added