Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
minLevel1
maxLevel7

...

  • Primary Meter: This is the current asset meter reading, sometimes referred to as the work meter. It is the most up-to-date meter reading and is updated throughout the RTA system.

  • Fuel Meter: This is the most up-to-date meter reading entered through the options in the Fuel Inventory module. This is tracked separately from the primary meter to ensure MPG figures are properly reported.

  • Alternate Meter: This is the meter reading for other types of meters that might be on the asset (e.g., hours, yards, cases). This meter has no ties to the Primary or Fuel meters.

  • Life Miles: This is the accumulated miles traveled for the life of the asset. The life miles can have the same or higher reading than the Primary and Fuel meters, but never a lower reading. Life miles continue to increase even though Primary meters may rollover or get reset to 0 when replaced.

All of these are displayed in the asset file in RTA Web on the Asset Management Tab.

Info

Primary and Alternate Meter Readings should be updated via Work Orders. Refer to Meters in Work Orders for instructions on updating meters through Work Orders.

Primary Meter Reading

Viewable

The current Primary Meter Reading can be seen in the following areas:

  • Asset File - Primary Information Banner

  • Asset File - Asset Management Tab

  • Work Order - Asset Information Banner

Editing

The Primary Meter reading can be edited from the asset file and through work orders.

Note

Work Orders should have the primary meter updated to the current reading. If there is an error in the meter reading, that should be done through the vehicle file using one of the options below.

Refer to WO Meter Updates for information on updating a primary meter through a work order.

Correction

Errors can happen when meter readings are updated or input when adding a vehicle. RTA Web can help with correcting a meter reading by following the below steps.

...

Expand
  1. Open the asset file and navigate to the Primary Meter Info Banner on the Asset Management tab

  2. Click on Correct Meter

  3. Click the Roll-Over Option

  4. Enter the highest value the meter can reach (this is the max value before the odometer rolled over)

  5. Enter the value of the odometer after the rollover (this is the reading that the rolled over meter is now displaying)

  6. Click Save at the bottom

Alternate Meters

An alternate meter may be another meter such as an engine or component hour meter OR it may represent items transported by the asset such as passengers, cases, boxes, tons, yards, and pallets.

...

Alternate meters can be used to help determine when PM services are needed. For example, if the asset has a standard odometer and an hours meter, the hours meter can be set up as an alternate meter and the PMs can be set up to be tracked by days, miles, and hours.

Setting Up Alternate Meter Types

Prior to assigning an alternate meter to an asset, the types/descriptions of alternate meters available for use need to be created.

...

Anchor
Adding-Alternate-Meters
Adding-Alternate-Meters
Adding Alternate Meters to the Vehicle

Once the alternate meter types have been set up, they can be applied in to assets. An asset can have up to 4 alternate meters assigned to it.

...

Expand
  1. Open a asset file

  2. Navigate to the Alternate Meter Info banner on the Asset Management tab

  3. Click Edit Description

  4. Click in the fields below the Alt One header

  5. Select the appropriate alternate meter type from the list created in RTA Classic

  6. Click the check mark

  7. If the asset will have additional alternate meters, continue steps 4-6 for alt two, three, and four where applicable

  8. Once all alternate meter types are entered, click done

  9. Once the meter types are are added, the headers will now display instead of Alt One, Two, Three, or Four

  10. To add the meter reading for each alternate meter, click in the field below the appropriate meter type heading

  11. Enter in the appropriate value

  12. Click the check mark

Editing Alternate Meter readings

Once the alternate meter types and values have been set up, they can be edited in the asset file. Refer to the Adding Alternate Meters to the Asset section of this document for set up instructions.

...