Review the following sample screens to see how they all tie in together in determining the estimated hours for a job.
When adding a work order line, you must specify the repair type. A repair type of CHECK uses the CHECK estimated hours in the VMRS code; a repair type of REPAIR uses REPAIR estimated hours; a repair type of REPLACE, DAMAGE, or PM uses RPLC estimated hours.
If RPLC estimated hours are needed, the system checks the vehicle difficulty factor to determine which RPLC hours to use. Difficulty factors can be set from 1 – 5 for ranges of VMRS codes.


In order to accurately track productivity statistics, the time standards set in the VMRS codes should be reviewed and revised as needed to fit your fleet. When setting time standards, be sure to account for the time according to your shop procedures. For example, if your shop starts counting time from the time the mechanic picks up the work order, you'll need to account for the extra time it takes the mechanic to bring the vehicle in from the yard into the bay and ready to be worked on. This can add a considerable amount of time to the job, especially for shops having to deal with extreme weather conditions. However, if your shop doesn't start counting time until the vehicle is actually in the bay and ready to be worked on, then the time standard should reflect only what is necessary to perform the job.
The Setup:

  • Review the Repair Type Codes in System Codes and change the Status number as needed (SSY). Refer to "Repair Type Codes." in Chapter 2Getting Started.
  • Set vehicle difficulty factors (discussed later in this section).
  • Review the VMRS codes and add or change the time standards for jobs as needed (MRM). Refer to "VMRS Codes." in Chapter 2Getting Started.

The Procedure:

  • Process work orders in the usual manner. Refer to Chapter 7Work Orders for instructions if necessary. The system determines the estimated hours when jobs are added to work orders. Productivity statistics are updated when jobs are completed.
  • Review productivity reports.
  • Process end of period for mechanics.

Anchor
difficulty_factors
difficulty_factors
Anchor
_Toc151867582
_Toc151867582
Anchor
_Toc200860761
_Toc200860761
Anchor
_Toc237141313
_Toc237141313
Anchor
_Toc487792252
_Toc487792252
Vehicle Difficulty Factors

Vehicle difficulty factors are one of the components used in determining the estimated time it takes to complete a job. They indicate how hard or easy it is to perform a job on a particular vehicle. Various difficulty levels, ranging from 1 through 5 (1 being the easiest level; 5 being the most difficult), can be assigned for various job groupings. Default difficulty factors are automatically assigned to a vehicle when it is initially added and saved in the system. The default values assigned are based on the vehicle size: Light = 1, Medium = 2, Heavy = 3, Trailer = 4, Other = 5. If this is acceptable, you may skip this portion of the setup.
NOTE: _If you later change the vehicle size, the original difficulty factors will not be affectedthe original values remain intact. Changes needed must be made manually._
To set or change vehicle difficulty factors, do the following:

...

  1. If you wish to use the same difficulty level for all jobs, enter a default value (1 – 5) and then press F4 to populate all the job groupings with the specified value and skip step 4; otherwise, skip this step and go to step 4.
  2. Enter the difficulty level (1 – 5) for the various job groupings. For example, the difficulty level set for System 1 – 9 is used if the VMRS code for the job falls in the range of 001-000-000 through 009-999-999. In determining the difficulty level to set for each of these categories, ask yourself how much room is needed to work on that area of the vehicle. If there is plenty of room, the difficulty factor will typically be lower. For example, a brake job on a vehicle with a large wheel well is usually easier to accomplish than a vehicle with a very small, enclosed wheel well.
  3. Choose OK to accept the settings.

Anchor
_Toc151867583
_Toc151867583
Anchor
_Toc200860762
_Toc200860762
Anchor
_Toc237141314
_Toc237141314
Anchor
_Toc487792253
_Toc487792253
Updating Productivity Statistics

If you're not using the Paperless Shop add-on module, productivity statistics are updated with the estimated and actual hours when jobs are completed on work orders (work order line status = Done). Estimated and accumulated hours worked for a pending job (work order line status = Unshd or Partial) are not included on productivity reports.
If you are using Paperless Shop, productivity is updated with the time worked each time mechanics clock off a job, even if the job is not yet complete. When the mechanic clocks off incomplete, his/her current mechanic productivity percentage rate is used to calculate a portion of the estimated hours thus keeping the productivity rate intact. In other words, if the mechanic is working on a job that is estimated to take 10 hours to complete but only has 2 hours clocked to it before going home for the day, rather than using 10 as the estimated hours for the job, the system calculates only a portion of the estimated hours. If it didn't, the productivity rates would inaccurately reflect a 500% productivity rate for that job!
Productivity statistics are available for the week, month, or last month. The system always updates the weekly statistics, and only the weekly statistics, when updating mechanic productivity. The monthly statistics are updated when end of period is processed for mechanics (SEW, SEM). Refer to "End of Period for Mechanics" in Chapter 11End of Period Processes for end of period processing instructions.

Anchor
_Toc151867584
_Toc151867584
Anchor
_Toc200860763
_Toc200860763
Anchor
_Toc237141315
_Toc237141315
Anchor
_Toc487792254
_Toc487792254
Productivity Reports

The following mechanic productivity reports are available. The format for each report is identical, only the data varies. By reviewing the productivity reports on a regular basis, you'll notice a trend in working habits. For example, if one mechanic consistently shows a good productivity rate in most areas except electrical jobs, perhaps these types of jobs should be assigned to another mechanic to help increase shop efficiency or better yet, you should provide training or cross-training to that mechanic to help bring up the productivity rate in this area.

...